Generator sets 10–2000kW · Diesel / Gas / Methanol · Built to your grid · Factory in Shenzhen, China
SINCE 2010 · SHENZHEN · MANUFACTURER & EXPORTER

Generator sets 10–2000kW,
built to your grid, not to a catalogue

Diesel, natural gas, biogas and methanol. Open skid, soundproof canopy, container power station, trailer or high voltage. 50Hz at 1500rpm or 60Hz at 1800rpm, 400/415V or 440/480V — fixed at order, tested before shipment, packed for the sea.

CE documentationEnglish manualsISPM 15 packing FOB / CIF / DAPOEM brandingCommissioning support

AT A GLANCE

Power range10 – 2000 kW
Frequency50Hz · 60Hz
Voltage400/415V · 440/480V
Platforms12 (Cummins, Perkins, CAT, MTU…)
CertificationCE · SONCAP · SASO · EAC
Lead time7 – 45 days
Loading portShenzhen (Yantian / Shekou)
Request a quotation →
2010Founded in Shenzhen
10–2000kWPrime power coverage
12platformsImported and Chinese engines
6regionsSE Asia · Middle East · Africa · LatAm · Central & South Asia
PRODUCT LINES

Four lines, because fuel decides the design

A generator is an engine plus an alternator until you add fuel, load, grid and climate. Then the details start to matter.

Diesel gensets

10–2000kW. Open, soundproof, containerized, trailer or 6.3/10.5kV high voltage. The most forgiving choice for standby and for sites where any technician can service it.

Gas & biogas

20–1000kW. Natural gas, LPG, biogas and oilfield associated gas. Gas treatment, mixer, pressure regulation, safety interlock and paralleling included.

Methanol gensets

30–1000kW. Ambient-temperature liquid fuel, almost zero sulphur, far lower particulate matter than diesel. Fuel system built with alcohol-resistant materials.

Genset + storage

PV-diesel-storage microgrids, grid-tied peak shaving, off-grid and UPS support. The battery takes the fast peaks and the genset takes the long hours.

POWER RANGE

Power, current and form factor on one table

Currents are calculated at 400V/50Hz and 480V/60Hz, three phase, power factor 0.8 — use them to size cables, breakers and transformer headroom.

Prime power (PRP) range · line current is an estimate
kWkVAA @400VA @480VTypical platformForm
20253630Yuchai / Weichai 4-cylOpen / canopy
5062.59075Yuchai 4-cyl · KubotaOpen / trailer
100125180150Cummins 6BT · Yuchai YC6ACanopy / trailer
200250361301Cummins 6LT · Perkins 1106Canopy / container
300375541451Cummins 6LTAA · Yuchai YC6MCanopy / container
500625902752Cummins QSX · Perkins 2206Container / skid
800100014431203Cummins QSX15 · Mitsubishi S6R2Container / 40FR
1000125018041504Cummins KTA38 · CAT 3512 · MTU 12V400040HQ / 40FR
12501562.522551880CAT 3512B · MTU 16V400040FR / break-bulk
1600200028862406CAT 3516 · Cummins QSK60Break-bulk / 40FR
2000250036083008CAT 3516B · MTU 20V4000Break-bulk / paralleled

Above 1000kW, evaluate 6.3kV or 10.5kV — but confirm the destination country's HV level, which may be 6.6kV, 11kV or 13.8kV.

RATINGS

PRP, ESP, COP — say which one you are buying

The same machine can be rated three different ways under ISO 8528. Tender documents use this to test suppliers; end users get caught by it at commissioning.

ESP
Emergency standby. Varying load, max 200 hours per year, no overload. Data centres, hospitals, fire pumps.
PRP
Prime power. Varying load, unlimited hours, 10% overload for 1 hour in every 12. The default for commercial and industrial use.
COP
Continuous power. Constant load, unlimited hours, no overload. Island grids and base-load plants.
Why a 500kW set does not carry 450kW on site Three usual reasons: it was rated ESP but used as PRP; ambient temperature exceeded 40°C without derating; or the load power factor is below 0.8, so current hits the limit before kW does.
DERATING

Heat and altitude are not optional

Available power
P = P_rated × (1 − altitude) × (1 − temperature)
Example: 500kW at 1500m (−4%) and 50°C (−8%) →
500 × 0.96 × 0.92 ≈ 442kW
ConditionDerating
Altitude 1000–1500mabout −4%
Altitude 2000mabout −8%
Ambient 45°Cabout −4%
Ambient 50°Cabout −8%
Exhaust back pressure over limitpower loss, high exhaust temperature
EXPORT

What we handle so the container does not sit at the port

Grid parameters

Voltage and frequency fixed at order, written into the electrical drawing you approve. Frequency cannot be changed on site.

Certification

CE, EAC, SONCAP (PC + SC), SASO/SABER, CO, FORM E. Who obtains which certificate, and by when, is written into the contract.

Packing & loading

Fumigation-free plywood cases, moisture barrier, rust protection, lifting marks. Loading plan with weights issued before booking.

Documents

Commercial invoice, packing list, B/L, certificate of origin, insurance. Scanned copies sent within 24 hours of sailing.

English manuals

Operation and maintenance manual, wiring diagram, factory test report, spare parts list. Spanish, French, Russian, Arabic, Indonesian, Vietnamese and Portuguese on request.

Commissioning

Engineers on site (1–2 people, 5–10 days) or remote guidance for your own electricians. Load test data handed over on completion.

Container loading, in short 20GP: 10–100kW soundproof sets 3–6 units, 200–300kW about 2 units. 40HQ: 200–300kW 3–4 units, 400–650kW 1–2 units. 800kW and above: 40FR or break-bulk, one unit per case. Weight limit — roughly 28 tonnes for a 20GP including tare — is usually reached before volume.
WHY FDKPOWER

Factory direct, configuration written down

01

Assembly and testing in-house

Alignment, skid, piping, wiring, control panel, canopy and container integration are done in our Bao'an plant. Visits and third-party inspection welcome.

02

Platform chosen by duty, not by brand

Cummins, Yuchai, Mitsubishi, Caterpillar, Perkins, Volvo, MTU, MAN, Shangchai, Weichai, Doosan, GOOGOL. Model and alternator brand stated on every quotation.

03

Test report travels with the set

Insulation, no-load, staged load 25/50/75/100%, four protection trips. English report, signed, part of the delivery documents.

FAQ

Questions buyers ask before the first order

Are you a factory or a trading company?

We are a factory. Shenzhen Fudongkang Generator Co., Ltd. was founded in 2010 and our plant is at 18-31B, Jiuwei Second Industrial Zone, Hangcheng Street, Bao'an District, Shenzhen. Assembly, load testing, soundproof canopy fabrication and container power station integration are done in-house. Factory visits and third-party inspections (SGS, BV, TUV, Intertek) are welcome — just give us one day's notice with the visitor list.

Can you build 60Hz sets with 480V or 440V?

Yes. 50Hz sets run at 1500rpm with 400/415V (or 380/220V). 60Hz sets run at 1800rpm with 440/480V (or 380/220V, 220/127V). Voltage is fixed at order through the alternator winding, not by an external transformer. Frequency must match the destination grid — a 50Hz set cannot be converted on site, so the grid parameters are confirmed in writing before production.

What is included in your FOB price?

FOB Shenzhen (Yantian or Shekou) includes the genset, standard accessories, canopy or container as configured, factory testing, export plywood packing, inland trucking and China customs clearance. It excludes ocean freight, insurance, destination port charges, import duty and certification fees. CIF, DAP and EXW are also available, and the quotation lists both included and excluded items with reference prices for the exclusions.

How many sets fit in a 20GP or 40HQ?

It depends on kW and canopy. Open or small soundproof sets (10–100kW): 3–6 units in a 20GP. 200–300kW soundproof: about 2 units in a 20GP or 3–4 in a 40HQ. 400–500kW: one unit per 40HQ or a flat rack. Above 800kW: one unit per 40FR or break-bulk. Weight, not volume, is usually the limit: a 20GP is capped at roughly 28 tonnes including tare, and a large set with canopy and wooden case gets close to that quickly.

What certifications can you supply?

We supply or assist with CE (Machinery Directive, LVD, EMC, with Declaration of Conformity and CE marking), EAC for the customs union, SONCAP for Nigeria (product certificate plus shipment certificate), SASO/SABER for Saudi Arabia, and general documents such as CO and FORM E. Scope, cost and lead time are stated in the contract so that a shipment is not held at the destination port for a missing certificate.

What is the lead time and warranty?

Standard lead time: 7–15 days for 10–200kW stock models, 20–30 days for 200–500kW, 30–40 days for 500–1000kW, and 40–60 days above 1000kW or for imported platforms. Soundproof canopy, container station, paralleling panel, high voltage or special voltage add 5–15 days. Warranty is 12 months or 1000 running hours, whichever comes first; imported engines follow the original manufacturer's terms. During warranty, spare parts are air-freighted and the first three days of site labour are covered.

CONTACT

Three lines are enough to start

Tell us the load, the grid, and the destination port. We will ask the rest.

  1. Load

    What the set will carry, total kW, and the largest motor that starts direct-on-line.

  2. Grid

    Voltage, frequency, phases, neutral arrangement — for example 400V/50Hz, three phase four wire.

  3. Destination

    Port or door point, trade term, and any certification or document language requirement.

Tel
+86 755 2748 9090 / +86 755 2749 1055
Mobile / WhatsApp
+86 198 7256 9168
Email
fdk@fdkpower.com (alternate: fdkpower@outlook.com)
Factory
18-31B, Jiuwei Second Industrial Zone, Hangcheng Street, Bao'an District, Shenzhen 518126, China
Hours
Mon–Sat 08:30–18:00 (GMT+8)

Request a quotation

Submit to copy your enquiry, then send it by email or WhatsApp. Or simply call us.

We use your details only to answer this enquiry.

Need a set that matches your grid, not a catalogue page?

Send the load, the voltage and frequency, and the destination port. You will get a configuration sheet with derating calculation and a loading plan — usually within one working day.

Email us WhatsApp