Generator sets from 10 to 2000kW, built to your load and your grid.
柴油、天然气、沼气、甲醇四类燃料;开架、静音、集装箱、拖车、高压五种形态; 50Hz 与 60Hz 双频,电压按目的国定做。 我们不做“通用现货”,按你的负载清单算容量、按你的电网定参数、按你的港口做包装与单证。
Diesel, natural gas, biogas, methanol and diesel-battery hybrid. Open skid, soundproof canopy, container station, trailer or 6.3/10.5kV high voltage. 50Hz at 1500rpm or 60Hz at 1800rpm, voltage wound to your grid. Every unit is sized from your load list, tested on a load bank before shipment, and packed for the sea.
Four product lines — diesel, gas, methanol and hybrid storage — chosen by fuel, load profile and emission limit.
发电机组这门生意,难点从来不是把发动机和发电机拼在一起,而是把燃料、负载、电网、环境、法规这五件事对齐。 四条产品线对应五种真实处境:没有气源、有气源、燃料要便宜且排放要低、以及既想保电又想省电费。
10–2000kW,开架 / 静音 / 集装箱 / 拖车 / 高压五种形态。最通用、最抗冲击、最容易在全世界找到会修的人。
功率谱与电流表 →20–1000kW,天然气、LPG、沼气、油田伴生气。年运行 3000 小时以上,燃料账才划得过来。
气耗与气源处理 →光储柴微网、并网削峰、离网与 UPS。机组负责长时间,储能负责快与省,EMS 负责谁先上。
容量测算与调度 →One table: prime and standby power, current at 400V and 480V, and the enclosure type for each rating.
表里的电流按 400V/50Hz 与 480V/60Hz 三相、功率因数 0.8 计算,用于选电缆、选断路器与核对变压器余量。 实际订货请以电气图为准——电压偏差 5%,电流就差 5%,电缆截面不能拍脑袋。
| 常用功率 kW | 视在功率 kVA | 电流 A @400V | 电流 A @480V | 常见平台 | 常见形态 | 典型用途 |
|---|---|---|---|---|---|---|
| 20 | 25 | 36 | 30 | 玉柴 / 潍柴 四缸 · 珀金斯 400 系列 | 开架 / 静音 | 商铺、基站、小型养殖 |
| 50 | 62.5 | 90 | 75 | 玉柴四缸 · 全柴 · 久保田 | 开架 / 静音 / 拖车 | 门市、小型工地、农庄 |
| 100 | 125 | 180 | 150 | 康明斯 6BT · 玉柴 YC6A · 上柴 D114 | 静音 / 拖车 | 便利店、小型工厂、活动 |
| 150 | 187.5 | 271 | 226 | 康明斯 6BTAA · 玉柴 YC6A | 静音 / 集装箱 | 酒店备电、通信枢纽 |
| 200 | 250 | 361 | 301 | 康明斯 6LT · 玉柴 YC6M · 珀金斯 1106 | 静音 / 集装箱 | 工厂、医院、商业体 |
| 300 | 375 | 541 | 451 | 康明斯 6LTAA · 玉柴 YC6M · 上柴 | 静音 / 集装箱 | 中型工厂、数据中心边缘 |
| 400 | 500 | 722 | 602 | 康明斯 QSL · 珀金斯 2206 · 玉柴 YC6T | 集装箱 / 开架 | 园区、矿山、海外工地 |
| 500 | 625 | 902 | 752 | 康明斯 QSX · 珀金斯 2206 · 上柴 | 集装箱 / 开架 | 数据中心、医院、厂区 |
| 650 | 812.5 | 1173 | 978 | 康明斯 QSX15 · 三菱 S6R | 集装箱 / 开架 | 大型厂区、区域备电 |
| 800 | 1000 | 1443 | 1203 | 康明斯 QSX15 · 三菱 S6R2 · 珀金斯 4006 | 集装箱 / 40FR | 数据中心、矿业、港口 |
| 1000 | 1250 | 1804 | 1504 | 康明斯 KTA38 · 卡特 3512 · MTU 12V4000 | 40HQ / 40FR | 数据中心、钢厂、机场 |
| 1250 | 1562.5 | 2255 | 1880 | 卡特 3512B · MTU 16V4000 · 康明斯 QSK50 | 40FR / 散杂 | 大型数据中心、矿山 |
| 1600 | 2000 | 2886 | 2406 | 卡特 3516 · MTU 16V4000 · 康明斯 QSK60 | 散杂 / 40FR | 园区总备电、海外电站 |
| 2000 | 2500 | 3608 | 3008 | 卡特 3516B · 康明斯 QSK60 · MTU 20V4000 | 散杂 / 多机并机 | 数据中心园区、孤网电站 |
注:电流按 I = P ÷(√3 × U × cosφ)估算,cosφ 取 0.8;含电机类负载启动冲击时,机组容量需按启动倍数放大。 1000kW 以上建议评估 6.3kV / 10.5kV 高压方案,电流可降到十分之一,电缆与开关更经济。
Sizing in four steps: load list, kVA at your power factor, site voltage and frequency, then altitude and ambient derating.
灯、加热器、UPS 是阻性;电机、水泵、压缩机、电梯是感性;变频器、LED 驱动、充电桩是非线性。三类负载对机组的要求完全不同:感性看启动冲击,非线性看波形与谐波。
直接启动电机按 5–7 倍额定,星三角与软启动按 2–3 倍,变频器按 1.1–1.3 倍。多台电机不要简单相加,按实际可能同时启动的组合取。
消防备电 0.9 以上,工地与活动 0.7–0.85,工厂按工艺排产取 0.8 左右。余量常规 20%–30%,带精密设备或长期连续运行留 30%–40%。
用 PRP 而不是 ESP 去核;长期负载率控制在 60%–80% 最经济。最后按现场海拔、温度、背压做降容修正,高温地区这一步经常被忽略。
P = (Σ 负载功率 × 同时系数) ÷ 功率因数 × (1 + 余量)320 × 0.8 ÷ 0.8 × 1.25 = 400kW,选 400kW / 500kVA 机组。
这是 ISO 8528 的口径,也是国际招标文件里最常用来卡人的三个词。同一台机器,标 ESP 比标 PRP 能高出 10%–12% 的数字。
Factory-direct means our own assembly line, load bank and canopy workshop in Shenzhen — no middle layer between you and the machine.
贸易商加价、配置单含糊、出问题找不到人——这三件事在发电机组行业太常见。我们的做法是把边界提前写清楚。
机组组装、静音箱体、集装箱电站成套、负载测试都在九围厂区完成。你可以来看,也可以约第三方验厂;关键节点我们主动发照片与视频,不用你催。
康明斯、玉柴、三菱、卡特、珀金斯、沃尔沃、MTU、MAN、上柴、潍柴、斗山都能配。按“年运行小时 × 停机代价”选平台,而不是按谁给的返点高。
英文说明书、接线图、测试报告、装箱单、原产地证、CE/SONCAP/SASO/EAC 按目的国配套。木箱用免熏蒸胶合板,省掉 IPPC 与熏蒸的麻烦。
Export is documentation as much as hardware: certification, fumigated packing, loading plans, customs papers and commissioning support.
七个动作,任何一个漏掉,都会在目的港或现场变成钱和时间。
电压、频率、相数、接地方式、随机文件语言,书面确认后再排产。频率错了几乎无法现场改。
写明配置清单、含与不含项、交期、验收标准、质保范围与责任划分。
关键节点发图:机组成套、控制屏接线、静音箱体、喷涂。第三方验货提前约。
绝缘耐压、空载、分级带载 25/50/75/100%、四项保护动作,出英文测试报告。
免熏蒸胶合板箱、防潮膜、干燥剂、固定支架;箱外标注重心、吊点与防潮标识。
发票、装箱单、提单、原产地证、保险单;开船 24 小时内发单证扫描件。
清关、内陆运输、就位、加注油水、调试带载、培训移交,或远程指导当地电工完成。
| 功率段 | 常见形态 | 装箱建议 |
|---|---|---|
| 10–100kW | 开架 / 静音 | 20GP 3–6 台 |
| 150–300kW | 静音型 | 20GP 2 台 / 40HQ 3–4 台 |
| 400–650kW | 静音 / 集装箱 | 40HQ 1–2 台 |
| 800–1250kW | 开架 / 集装箱 | 40FR 或 40OT,一件一箱 |
| 1250kW 以上 | 开架 / 电站 | 散杂船或分体运输 |
Twelve engine platforms in regular build — Cummins, Perkins, Yuchai, Weichai, Shangchai, Mitsubishi, Caterpillar, Volvo, MTU, MAN, Doosan and more.
下面的品牌是可选配置范围,不是唯一选项。每一份报价单都会写明本项目用的发动机型号与发电机品牌。
Eight reference projects we can describe down to the configuration: data centre, construction site, grid emergency, hotel, medical and logistics.
案例只写三件事:原来什么问题、配了什么、结果如何。客户名称已获准公开,配置细节按项目实际。
2×1000kW 并机 + ATS + 8 小时储油。关键动作是把满载测试做实:分级带载到 100%,记录电压跌落与排温,交付时把测试数据一并归档。
400kW 集装箱式机组,防雨防尘、外置油罐。塔吊与水泵的直接启动冲击按 6 倍核算,容量放大 30%,避免夜间浇筑时跳闸。
多台机组并机 + 快速切换,按电力行业验收口径做保护定值整定与带载试验,交付资料含整定单与试验报告。
地下机房静音机组,二级消声 + 进排风消声百叶,烟管改高排。整改后厂界噪声达标,客房侧无明显感知。
按医疗设备负载特性配容量,加装 UPS 做切换空档支撑,切换时间控制在设备允许范围内,验收做三次连续切换。
物流中心与电商数据中心备电,N+1 配置,月度空载试机、季度带载、年度满载,测试数据进设备档案逐年比对。
Six export regions, each with its own voltage and frequency, climate derating and certification route.
同一个 500kW,发到沙特和发到智利,配置单能差出十几项。下面按区域整理了电压频率、降容、认证与物流要点。
The rest of this page is in Chinese. Below is the same information in English; the full English site is at fdkpower.com/en/.
Shenzhen Fudongkang Generator Co., Ltd., founded in 2010. Our factory sits in Bao'an District, Shenzhen, China, where we assemble, load-bank test and integrate every set on our own floor: open skid, soundproof canopy, container power station, trailer and 6.3/10.5kV high voltage. A factory with an export desk — not a trading office.
Diesel 10–2000kW · natural gas, LPG and biogas 20–1000kW · methanol 30–1000kW · diesel-battery hybrid and BESS cabinets. Prime (PRP) and standby (ESP) ratings to ISO 8528, and the quotation always states which rating the price is based on.
50Hz at 1500rpm: 400/415V, 380/220V. 60Hz at 1800rpm: 440/480V, 220/127V. Any other voltage is wound to order — never faked with a step-down transformer. Derating for altitude above 1000m or ambient above 40°C is calculated and attached to the offer.
Cummins, Perkins, Yuchai, Weichai, Shangchai, Mitsubishi, Caterpillar, Volvo, MTU, MAN and Doosan, coupled with Stamford-class alternators (Stamford, Leroy-Somer, Marathon, Engga). Engine brand, model and country of origin are named on the quotation — no vague “original brand”.
FOB Shenzhen (Yantian or Shekou), CIF or DAP. CE, SONCAP, SASO/SABER and EAC prepared or supported per destination. Every shipment carries an English operation manual, wiring diagram, factory test report, packing list, invoice, bill of lading, certificate of origin and FORM E where applicable. 20GP / 40HQ loading plans with weights are issued at quotation stage.
12 months or 1000 running hours, whichever comes first; 5 years for the BESS cabinet with a capacity-retention commitment. A 1000-hour kit (oil, fuel and air filters, belts, sensors) travels with the unit. Remote diagnostics over Modbus, and engineers to major ports in Southeast Asia, the Middle East and Africa within 3–7 days.
Send three lines: what the set has to carry, site voltage and frequency, and the destination port. A configuration sheet, drawing package and FOB / CIF price come back within 24 hours on working days. Factory video inspection and past project files available on request.
Email fdk@fdkpower.com · Tel +86 755 2748 9090 · WhatsApp +86 198 7256 9168. Office hours Monday to Saturday, 08:30–18:00 GMT+8; enquiries from other time zones are answered the same working day.
Frequently asked by overseas buyers: pricing terms, lead time, certification, container loading and after-sales support.
这些问题来自真实的询盘邮件与展会现场。答案写得长一点,是因为短答案通常会误导人。
是工厂,不是纯贸易。深圳市富东康发电机有限公司 2010 年成立,工厂在深圳市宝安区航城街道九围第二工业区18-31B,做机组组装、负载测试、静音箱体与集装箱电站成套。客户或第三方验厂随时可以来,提前一天给个名单,我们安排人陪同看装配线、测试台与在制机组,也可以现场做带载演示。出口客户如果不方便来中国,可以约视频验厂,从进料区走到测试台,边走边拍,配合第三方检验机构(SGS、BV、TÜV)的驻厂验货。
常规报 FOB 深圳(盐田或蛇口),也可以报 EXW 工厂交货、CIF 目的港、DAP 到门。FOB 价含机组本体、标配附件、静音箱或集装箱(按配置)、出厂测试、出口木箱包装、国内拖车与报关;不含海运费、保险、目的港费用、目的国关税与认证费用。CIF 在海运费与保险之外,还会写清目的港与免堆期,避免到港后产生滞箱费。报价单上会把“含”与“不含”逐条列出,不含项也标出参考价,方便你核算总成本。
都能做。50Hz 对应 1500rpm,常用 400/415V(也可 380/220V);60Hz 对应 1800rpm,常用 440/480V(也可 380/220V、220/127V)。电压在订货时定死,靠发电机绕组抽头或改绕实现,不是靠变压器凑。频率必须与目的国电网一致:60Hz 国家(菲律宾、沙特、巴西、秘鲁、哥伦比亚、墨西哥、韩国等)不能发 50Hz 机组过去凑合用,除非是纯离网带变频负载。下单前把你的电网参数发我们,出图确认后再排产。
可以按目的国要求配套或协助办理,费用与周期单列。常见几类:欧盟 CE(机械指令、低电压指令、EMC,配 Declaration of Conformity 与铭牌 CE 标识);尼日利亚 SONCAP(先做产品注册,出货前验货出 SC 证书);沙特 SASO/SABER(PC 与 SC 证书,需能效与安全文件);俄语区 EAC(海关联盟技术法规);部分国家还要 CO 原产地证、FORM E(东盟)、装运前检验。我们的做法是在合同里写明“由谁负责哪张证、什么时候要”,避免货到港才发现缺证被扣。
取决于功率与形态,不能一概而论。开架型与小型静音机组(10–100kW)20GP 常见装 3–6 台;200–300kW 静音型 20GP 约 2 台、40HQ 约 3–4 台;400–500kW 多为 1 台配 40HQ 或框架箱;800kW 以上基本一件一箱,用 40FR/40OT 或散杂船。真正的限制常常不是体积而是重量:20GP 限重约 28 吨(含箱重),40HQ 约 26–28 吨,大功率机组加静音箱与木箱很容易超标,这时要拆件运输(机组与油箱分装)或走框架箱。装箱方案在报价阶段就给草图与重量清单。
常规配置:10–200kW 常备机型 7–15 天;200–500kW 20–30 天;500–1000kW 30–40 天;1000kW 以上或进口平台 40–60 天。带静音箱、集装箱电站、并机柜、高压输出或特殊电压的,另加 5–15 天。储能柜标准型号 25–40 天。加急可以,靠插单与加班,通常能压缩 20%–30%,但要接受加急费,并且不能省掉出厂测试——省测试的机组到现场出问题,返工成本远高于赶工省下的时间。
三条路并行。第一,随机备件包:按 1000 小时保养量配机油滤、柴油滤、空气滤、皮带、水泵密封与常用传感器,跟主机同船走,落地即可保养。第二,远程诊断:控制器(深海、科迈、众智等)支持 Modbus,接上网关后可远程读报警、参数与运行曲线,多数电气与保护类问题当天能定位。第三,人到现场:东南亚、中东、非洲主要港口城市 3–7 天可派工程师,签证与差旅按实结算或打包进合同。常用易损件我们在深圳常备库存,DHL 空运 3–5 天到主要城市。
常规是 T/T 30% 定金排产、70% 见提单副本或出厂前付清;金额较大或政府项目可做即期信用证(L/C at sight),我们接受 FOB 与 CIF 条款下的信用证。第一次合作,定金比例可以谈,但不会做到零定金——机组是按你的电压频率定制的,不是通用现货。长期客户可以谈年度框架与账期。所有付款走公司对公账户,收款人名称与合同一致,不接受付到个人账户,这一点请务必注意,也是防骗的基本动作。
因为发电机的能力受电流与温升限制,标 kVA 更贴近物理;发动机的能力标 kW。两者关系是 kW = kVA × 功率因数,机组通常按 0.8 标定,所以 500kVA ≈ 400kW。买机组时看你需要的有功功率(kW),再核对功率因数:如果负载里有大量电机、UPS 或变频器,功率因数可能低于 0.8,这时要按实际功率因数反算 kVA 并放大容量。只比 kW 不看功率因数,是选型最常见的坑之一。
看你所在的地方三件事:甲醇好不好买、柴油贵不贵、排放要求严不严。甲醇常温常压是液体,储运跟柴油一样简单,不用像天然气那样上高压罐或管道;硫含量极低,颗粒物排放比柴油低很多;价格在很多地区比柴油便宜,尤其是有煤化工或绿色甲醇供应的地区。代价是热值低(约 19.9MJ/kg,柴油约 42.7MJ/kg),同样功率的燃料体积流量大约翻倍,油箱要加大;甲醇有腐蚀性与毒性,燃料系统要用耐醇材料,机房要通风与泄漏报警。年运行小时高、燃料采购稳定的项目,甲醇的经济性才明显;只做应急备电,柴油更省心。
支持。OEM 包括:铭牌与 LOGO 换你的品牌、机身颜色按你的色卡喷、说明书与随机文件用你的模板、控制器界面语言定制、包装箱印你的标识。起订量通常 3–5 台起,具体看机型与改动的深度;涉及电气原理或结构改动的,要先做工程确认与样机。OEM 不影响我们的质保责任,质保由我们对你负责,你对终端客户负责,接口清楚。要贴牌的话,把品牌 VI、色号(如 RAL 号)与铭牌内容规范发过来,我们出确认稿。
常规:机组整机 12 个月或 1000 运行小时(以先到为准),进口平台随机组原厂质保条款执行;储能系统整机 5 年,电芯按容量保持率考核(常见 10 年不低于 70%)。质保不含:未按手册保养、超载或欠载长期运行、缺油缺水、进水进尘、非我方改动的电气、不可抗力。海外项目的质保有个现实问题——谁去修、备件谁出、工时怎么算。我们的做法是在合同里写明:质保期内质量问题由我们提供备件(DHL 空运),现场工时首个 3 天由我们承担或派工程师,之后按约定单价结算。写清楚比口头承诺有用。
七步:一、确认负载清单与电网参数,出选型与配置单;二、签合同付定金,锁定电压频率与随机文件语言;三、生产与过程检验,关键节点发照片或视频;四、出厂测试(空载、分级带载、保护动作),出英文测试报告;五、出口包装与装箱,做熏蒸或免熏蒸处理,出装箱单;六、报关出运,提供发票、装箱单、提单、原产地证与保险单;七、到港清关、内陆运输、就位安装、加注油水、调试带载、培训移交。第三步到第六步是我们主场,第一、二、七步需要你配合给参数与现场条件。
只需三行信息:要带什么负载、现场电压与频率、交到哪个港口。剩余的交给我们——选型、配置、测试、包装、单证、海运与调试培训。